#56 rpm-mock-build: remove complexity brings by required-project support
Merged by zuul. Opened by fbo.
fbo/zuul-distro-jobs rpm-mock-build-simple  into  master

Download 56.patch

Remove the complexity previously added when working on the DNF project integration.
Idea was to build Zuul required-projects in addition to the project being tested
because merged PRs are not automatically built and publish (I mean rpms).

Solution was instead to propose to DNF folks to manage a dnf-master repository.
A Zuul job is attached to PR merged to build on that copr repo.

This master repo is used as input to rpm-mock-build job. I think that workflow
should be the one we promote. Thus that patch is removing the previously added
complexity.

Build succeeded.

Metadata Update from @fbo:
- Pull-request tagged with: gateit

Build succeeded (gate pipeline).

Pull-Request has been merged by zuul

Metadata