#54 rpminspect copr switch to a new copr repo
Merged by zuul. Opened by fbo.
fbo/zuul-distro-jobs newrpminspectcopr  into  master

Download 54.patch

According to David Cantrell the copr move recently:
https://github.com/rpminspect/rpminspect/issues/107

Build succeeded.

rebased onto 94014b1d8044a975503cd9d3b64d393d0811ad03

Build succeeded.

Metadata Update from @fbo:
- Pull-request tagged with: gateit

Build succeeded (gate pipeline).

Pull-Request has been merged by zuul

Metadata